Table of Contents

LEED Cleanroom

Introduction to Modular Cleanrooms

AXENIC SYSTEMS (established in 1995) is one of the leading companies engaged in planning and installing of LEED Cleanroom to carry out several manufacturing process. LEED Cleanroom offers third-party authentication that a cleanroom is functionally designed and built using strategies that improve performance. A team of highly skilled professional strategies pre-design consulting, constructability analysis, through tenancy across geographic regions, industry sectors, and facility categories.

The LEED certified cleanroom is a worldwide recognized cleanroom system. The program offers third-party verification that a cleanroom is designed and built using strategies that improve performance in areas including water efficiency, energy savings, CO2 emissions reduction, enhanced indoor environmental quality, stewardship of resources, and sensitivity to their impacts.

LEED Cleanrooms is a cleanroom that is constructed from pre-fabricated, manufactured components that are assembled according to specifications on-site. These pre-fab components contain wall and ceiling panels as well as distinctive features like pass thru chamber panels and air locks.

There are several different design options for LEED Cleanrooms, depending on the cleanroom’s needs in terms of application and required classification. They can be free-standing structures or incorporate existing walls and structures within your facility or factory. LEED Cleanrooms incorporate existing equipment and HVAC. They can have hard walls that resemble traditional construction or soft walls that are slightly tent-like for better flexibility and ease of transport.

Benefits

  • LEED Cleanroom can be built fast and quickly with minimal interruption in your facility. 
  • They can be easily extended or modified.
  • LEED Cleanroom can be taken apart and reassembled in a new location. 
  • Even though the mechanisms of LEED Cleanrooms are somewhat universal, it can still be customized with a wide range of special features and equipment to make sure that it meets the application’s particular needs. 
  • LEED Cleanroom save time and money over most conventionally constructed cleanrooms. 

Construction

The construction supervision team provides comprehensive LEED construction management services covering the complete execution procedure from pre-design consulting, constructability analysis, through tenancy across geographic regions, industry sectors, and facility categories. We use lean construction and project delivery tools and methods including offsite and flexible construction to diminish waste and build value throughout each phase of project delivery, without compromising safety.

Pre-construction management sets the foundation for success in the construction and post construction stages of a project. Pre-construction professionals provide constructability as an addition of our design disciplines. We modernize the transition from beginning into the construction phase, and forms an alignment between the client, design, and construction teams. We build a realistic roadmap that imitates critical milestones, goals, and objectives, and recognizes the activities necessary for successful project completion.

Some major points considered for cleanroom construction:

Risk and Schedule Management: –
Our leading project control team takes a pre-emptive approach throughout the project life cycle in considering schedules and risks – key factors in the success of any project. As the construction manager and prime, we assess all of our trade partner sub-contractors against our safety, capability, and financial strength standards.

Sub-contractor Supervision: –
We have solid relationships with local sub-contractor communities throughout the globe. We build a proposal list of local trade contractors who are familiar with the location, region, and project type from our proprietary contractor database.

Resources Management: –
Our procurement experts enhance supply chain procedures to ensure the most cost-effective development, obtaining, purchasing, moving, storing and controlling of materials. We have enthusiastic expertise in logistics as well as expertise in obtaining of owner equipment, trade and professional services and materials in addition to subcontracts for construction.

Applications

Some industries that uses LEED Cleanrooms are: –

Aerospace: The critical nature of equipment manufactured for aerospace requires that components produced are free from dangers of contaminants and particulates. This can only be accomplished in a LEED Cleanroom. The slightest fault or weakness in a delicate instrument can result in dangerous conditions and substantial losses.

Automotive: The automobile industry makes extensive use of LEED Cleanroom from the beginning procedure to the final product. In the early design phase, prototypes are tested and examined in clean rooms to establish their sustainability.

Pharmaceutical: The challenging regulations and health standards for the production of drugs and medicines has made the Pharmaceutical industry a prime user of LEED Cleanroom. The industry has a constant concern for any form of bacterial contamination and takes extreme measures to make sure every product is antiseptic and clean of any possible side effects from production errors.

Electronics: LEED Cleanroom for the electronics industry are inexpensive and more flexible than traditional clean rooms. The design of LEED Cleanroom permits for expansion and modification of the clean room depending on the necessities of production. For the electronics industry, LEED Cleanroom ensure the stability and presentation of their products by producing them in contaminant free surroundings. The manufacturing space must be very clean and vibrant.

Search for tags: what is LEED